Indoor Super Slow Mo


In this challenge team members must work together to design and construct a guide route for a rollerball, using only the materials provided. The aim is to achieve the slowest time rolling the ball from start to finish along the route. The start and finish points are at fixed positions, and teams work against the clock to perfect their designs.The activity will culminate with a finale, as all teams put their designs to the test.

Teams must decide whether to invest more time in the design stages, or to construct as quickly as possible and test out various techniques before deciding on the final design. This event is ideal as a single break out activity, or alternatively can be run alongside other team challenges.